Saturday, 9 April 2011

1st Real Drama to sort out quickly.

After some good progress, all was looking good.  I thought I should check the plumbing against the plans, oops, someone has stuffed up. ! !  Where the Powder room is located there should be 1 x waste for the Vanity unit and 1 x waste for the toilet....looks like the toilet waste is there in the correct spot - BUT the vanity waste is nowhere to be found.  There is also another pipe up into the WIR of the BED 4 ??  should not be there.

The Drama is that the Polystyrofoam blocks and steelwork has mostly been laid and the slab boxed up ready for a concrete pour on Tuesday ( last word I had from Ashford Homes ). They better not do that till the plumbing is fixed.  Not sure what plans the plumber was working to. CR from Ashford homes told me the plumber was fixing this up on Friday - clearly not done.

During the week - slab area cleared- base material spread out - still have not fixed the plumbing Pwdr room

Some Photo's from Saturday - before the rain set in.



Pipe sticking up in the area where WIR for Bed 4 is to go.

No comments:

Post a Comment